Search

Maintenance Pilot Design Contract

Contract Award

General Information

China
   wb:op00040896
   Feb 8, 2017
   World Bank
   English
   Other

Contact information

   Guiyang Rural Roads Project
China

Goods, Works and Services

Contract administration services  

Original Text

      

Publication of the Award of Contract-Rural RoadsMaintenance Pilot Program Design-Guiyang Rural Roads Project

 

[CHINA]

[Guiyang Rural Roads Project]

Loan No./Credit No./ Grant No.: Ln.8337-CN

Assignment Title: Maintenance Pilot Design

Reference No. (as per Procurement Plan): Contract No. GYNL202

RFP No.: b0708-CMC16Q7401

 

1.The name of all consultants in the shortlist

NO.

Name of Consultant

Nationality

Proposal Submitted

1

HJI Group Corporation

USA

Yes

2

Guizhou Bridge Design Institute Limited Company

China

Yes

3

Guizhou University

China

Yes

 

2.The technical score of each consultant

Consultants' names

HJI Group Corporation

Guizhou Bridge Design Institute Limited Company

Guizhou University

Criteria

Score

 

 

 

Specific Experience

10

10.00

9.67

10.00

Work Plan & Methodology

30

28.33

24.66

25.00

Key Experts

60

52.84

55.00

57.00

TechnicalScore

100

91.17

89.33

92.00

Rank

 

2

3

1

 

3.The name of the successful consultant and the price, duration and summary scope of thecontract.

The name of the successful consultant is Guizhou University(China).

The finalnegotiated price is RMB 2, 729, 400.00, inclusive of local indirect taxes.

The duration ofthe contract is 12 months

The summary scope of the contract is summarized below: Design a maintenance pilot program that addresses the following keyissues:

a)MaintenancePractices. Based on a review of current maintenance practices, needs and budgets, the Consultant will analyze options includingroad maintenance groups, maintenance contractors, maintenance yards (with related options for ownership/operation and work scope), performance-based contracting, and staff training.

b) OverloadingControl. Based on traffic surveys and a review of overloading sources and control mechanisms, the Consultant will analyze optionsincluding mobile weighing equipment, road sensors/cameras, fixed overloading control stations, and changes to overloading fines.

c) Monitoringand Surveying. Based on areview of data requirements and current collection techniques, the Consultant will analyze optionsincluding alternative data collection options, road condition surveying equipment, road inventory surveying tools, and mobile- andweb-based inspection technologies.

d) MaintenanceImplementation Funding. Based on an analysis of existing maintenance funding levels, sources and expenditure, the Consultant willassess options including alternative funding sources, leveraging increased funding through project support, and improvingefficiency of funding use.

e)PavementMaintenance Materials. Basedon a review of current pavement maintenance materials and applicationtechniques, the Consultant willassess options including alternative materials and application techniques and the need for a rural roads materials supplystation.


Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.